Paving Contractor driveway contractor Reisterstown Paving Contractor Reisterstown
driveway asphalt paving Reisterstown
homepage contact us paving gallery before and after links asphalt paving faq client testimonials request asphalt estimate
driveway asphalt paving Brooklandville
 
 

Frequently Asked Asphalt Paving Questions - F A Q

 
   

Asphalt Paving FAQ

 
Q:  What is asphalt and how is it installed?
   
A:  Asphalt is a petroleum based flexible pavement. For the best result, a professional organization like Absolute Paving, utilizing specialized equipment should complete the installation.
   
Q:  What are the benefits of an asphalt driveway or parking lot?
   
A:   Asphalt is a flexible pavement that flexes during the harsh weather
conditions experienced in our area. An asphalt driveway or parking lot is aesthetically pleasing and maintained easily and inexpensively.
   
Asphalt Paving BWI Airport
Q:  How much will my asphalt project cost?
   
A:  The cost of asphalt varies for every job. Asphalt is a product whose cost is based on the amount of labor and material required to complete the job. The majority of the variation in cost lies in the preparation of the existing surface and the size of the project.
   
Q:  How long will my asphalt driveway or parking lot last?
   
A: Your asphalt driveway or parking lot should last approximately 20 years if properly installed over a well compacted stone base.
   
Q:  How do I maintain my new asphalt surface?
   
A: Keep gasoline and oil from accumulating on your driveway.
Preventative maintenance including crack filling should be completed on an as-needed basis.
   
Q:  Do I have to be at home the day of the scheduled work?
   
A: You do not have to be home the day of scheduled work as long as the driveway is clear of all vehicles and any vehicles required over the next 48 hours should be removed from your garage.
   
Q:  Do I need to do anything special the day of installation?
   
A: Yes, we will need access to your garage and an adequate water supply (a garden hose is fine).
Asphalt Paving BWI Airport
   
Q:  How long should I stay off a newly paved surface?
   
A:  Most driveways or parking lots are blocked off for 2 to 3 days.   However, if imperative, asphalt can be driven on (not parked on) once the roller has completed the job. Extreme care should be taken for at least one week (for example no sharp wheel turns).
   
Q:  Will you block my driveway/parking lot after services are completed?
   
A:  Yes, we will block off your driveway/parking lot when the job is complete. You can open your drive to traffic the day after completion.
   
Q:  Can asphalt be applied year round in Maryland?
   
A: No. Our season for asphalt application runs from March through December.
   
   
 
     Example of Towns Served:
 
 
Brooklandville, MD 21022
Cockeysville, MD, 21030
Eldersburg, MD 21784
Ellicott City, MD 21042
Finksburg, MD 21048
 
Hampstead, MD 21074
Hunt Valley, MD 21031  
Lutherville, MD 21093   
Manchester, MD 21102  
Marriottsville, MD 21104  
 
Owings Mills, MD 21117
Pikesville, MD 21208  
Randallstown, MD 21133   
Reisterstown, MD 21136 
Ruxton, MD 21204  
 
Sparks, MD 21152
Timonium, MD 21093  
Towson, MD 21204  
Upperco, MD 21155 
Westminster, MD 21157
 
asphalt paving footer
     Copyright © 2001-2012 Absolute Paving Inc.
MHIC#
50974 
HTML 4.01
Internet Marketing: InternetBeacon.com
Frequently Asked Asphalt Paving Questions                Asphalt Paving Maryland Asphalt Driveway Maryland